New Energy Electric Vehicle Drive Motor Road Condition Simulation Test Bed

Product Details
Customization: Available
After-sales Service: on Line
Warranty: One Year
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
Flexible Customization
The supplier provides Flexible customization services for your Personalized requirements
Raw-Materials Traceability
The supplier has traceability identification of raw materials
Production Process Visualization
You can check the supplier's production workflow chart or main facilities in the Audit Report
to see all verified strength labels (22)
  • New Energy Electric Vehicle Drive Motor Road Condition Simulation Test Bed
  • New Energy Electric Vehicle Drive Motor Road Condition Simulation Test Bed
  • New Energy Electric Vehicle Drive Motor Road Condition Simulation Test Bed
  • New Energy Electric Vehicle Drive Motor Road Condition Simulation Test Bed
  • New Energy Electric Vehicle Drive Motor Road Condition Simulation Test Bed
  • New Energy Electric Vehicle Drive Motor Road Condition Simulation Test Bed
Find Similar Products

Basic Info.

Model NO.
CN
Max Diameter of Workpiece
900mm
Mass Scope of Workpiece
<900kg
Type
Motor Test Bed
Maxcapacity
<1000KN
Accuracy Grade
0.5
Load Way
Electronic Load
Loading Method
Dynamic Load
Display
Digital
Control
Computer Control
Weight
0-100Kg
Power Source
AC220V
Operating Environment
0~40 Degree Celsius
Power Supply
AC220V Positive and Negative 15%
Transport Package
Dust-Free Packaging + Sturdy Wooden Crates
Trademark
Changniu Technology
Origin
Hangzhou, China
Production Capacity
50pieces/Year

Packaging & Delivery

Package Size
900.00cm * 700.00cm * 1500.00cm
Package Gross Weight
150.000kg

Product Description

Overview of new energy vehicle motor stator test system:
It is mainly used to test the performance of stators of various single-phase motors, three-phase motors, brushless motors, synchronous motors, servo motors and other motors, and it includes all items of stator performance inspection. It can quickly detect the parameters of national and enterprise compulsory inspection items (power frequency withstand voltage, insulation resistance, inter-turn insulation, DC resistance, rotor steering) and so on. One wiring for all inspection items to be completed quickly.
New Energy Electric Vehicle Drive Motor Road Condition Simulation Test Bed

It has the advantages of fast test speed, high precision, easy to use, good reliability, etc., and automatically analyzes and judges the test results; At the same time, it has the functions of statistics, storage, and printing yearly, monthly, and daily reports. All the parameters of the motor under test can be preset for testing.
Main features of new energy vehicle motor stator test system:
1. Test items: DC resistance, insulation resistance, turn-to-turn test, withstand voltage test, motor steering test, inductance test
2. DC resistance: test the resistance of the motor winding resistance 3. Insulation resistance: test the insulation resistance between the phase wire and the shell
4. Inter-turn test: judge the inter-turn short circuit, poor insulation, and out-of-tolerance of the motor or transformer coil 5. Withstand voltage test: measure the withstand voltage leakage current between the stator winding and the shell, program control and withstand voltage, and can be controlled by computer withstand voltage regulation
6. Motor steering: determine the direction of rotation of the magnetic field
7. Inductance test: measure the inductance of the motor coil
8. Power supply: AC220V±15%, 50Hz±2 Hz (system working power supply)
9. Operating environment: working temperature 0~40 °C
10. Working humidity≤70%11. All tests are completed in one clamping.
12. All testing processes are controlled by microcomputer.

Test items and accuracy level of new energy vehicle motor stator test system:
 

Test process of new energy vehicle motor stator test system:
Software and hardware automatic test process: The test sequence, test time, and number of test items can be flexibly adjusted. The default test sequence is: DC resistance/power frequency withstand voltage test/insulation resistance/turn test/inductance test/swivel direction test.
New energy vehicle motor stator test system system setting and alarm:
1. When the project test fails, it will alarm and you can choose to continue the measurement or stop the measurement, and press continue to continue when you choose to stop the measurement.
2. It has alarm and emergency stop functions.

Docking between the stator test system system of new energy vehicle motor and the motor:
1. The docking between the system and the motor is in the form of a binding post or a lead-out wire.
2. Connect all the motor leads to the system, and automatically switch the wiring mode within the system during the test.
New Energy Electric Vehicle Drive Motor Road Condition Simulation Test BedNew Energy Electric Vehicle Drive Motor Road Condition Simulation Test BedNew Energy Electric Vehicle Drive Motor Road Condition Simulation Test BedNew Energy Electric Vehicle Drive Motor Road Condition Simulation Test BedNew Energy Electric Vehicle Drive Motor Road Condition Simulation Test BedNew Energy Electric Vehicle Drive Motor Road Condition Simulation Test BedNew Energy Electric Vehicle Drive Motor Road Condition Simulation Test BedNew Energy Electric Vehicle Drive Motor Road Condition Simulation Test Bed

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
People who viewed this also viewed